| Wolf Creek Stream Restoration |
|
|
|
|
On August 30, 2012, PAN was awarded $180,957 by the West Virginia Department of Environmental Protection to implement a stream restoration project in the headwaters of the Wolf Creek Watershed. Milestones Schedule
The proposed stream restoration project aims to restore a headwater tributary running through three adjoining parcels using natural stream design techniques (referred to as Nolen parcel, Amick parcel, Cottle parcel). PAN has partnered with Baker Engineering to develop plans for the restoration. In March of this year, Baker completed a preliminary engineering report (PER) for the project area and developed a conceptual design for restoring the stream. The project will involve restoring 600 ft. of stream back to an open channel, connecting the stream channel to appropriately sized culverts, and connecting the stream to the original tributary. The restoration project will reduce the frequency of flooding events, improve drainage through the adjoining parcels and restore stream functionality.
Preparing this proposal has not been an easy task, and will involve many partners. Currently all property owners are interested in a long-term solution. A Memorandum of Understanding has been signed by all properties owners involved. This partnership, combined with resources from the Department of Environmental Protection, will produce a cost effective project that is managed by experienced agencies. The project will be coordinated with West Virginia Department of Environmental Protection Non-Point Source Program, the West Virginia Division of Highways (District Nine) and the United States Army Corps of Engineers.
|